Labour Standards Audit

Our labour standards audits take into account the complexities involved in the varied aspects on how employees are treated in regards to wages, working hours and work conditions. These audits help ascertain as to how a business treats its employees and the environment and ensures that a business meets minimum stipulated labour standards.

Our auditors will meet with facility management and explain the purpose of the visit, collect necessary documentation and conduct an extensive tour of the facility to ensure that all health and safety precautions are adhered to.

Onsite interviews with employees are conducted to determine that they are treated fairly. Wage and attendance records are inspected thoroughly to ensure that no violations have occurred in relation to payment of minimum wages, work hours and that the hiring process is in line with the labour laws of the country.

Any labour standards violations or shortfalls are followed up with suitable corrective action before facility approval takes place.

IPS Lanka labor standards audit programs are based on the following code of conduct elements:
  • Compliance with the law of the land
  • Meeting at least minimum wages and benefits
  • Ensuring that maximum working hours are not exceeded
  • Zero tolerance for forced labour
  • Zero tolerance for child labour
  • At least minimum health and safety standards are met
  • Non-discrimination of workforce.
  • No corporal punishment has taken place
  • Freedom of association amongst employees is visible and present
  • That the facility operates in an anti‐corruption / anti‐bribery environment
  • That facility sub-contractors (if any) meet all above stipulated conditions

Selasa, 24 November 2015

Apparel manufacturing:

Apparel manufacturing: 
Yarn Dyeing: 
Yarn dyeing is a special type of dyeing process. This dyeing process is slightly difference from woven or knit dyeing. Dyed yarns are used for making stripe knit or woven fabrics or solid dyed yarn fabric or in sweater manufacturing. Yarn can dye in two form, package or hank form. Flowchart of yarn dyeing can be divided into three stages. Preparatory process, Dyeing and After-treatment process.
Yarn dyeing in package form
Yarn dyeing in package form
Flow Chart of Yarn Dyeing

Preparatory process 

Soft winding 
 
Batching 

Batch loaded 

Demineralization (50˚C, 20 min; PH=4.5) 

Scouring & bleaching (100˚C×40 min.) 

Drain 

Rinse 

Drain 

Neutralization with acid (50°C ×20 min) 

Hot Wash with peroxide killer (60˚C,20 min.) 

Drain 

Dyeing

Leveling agent & Salt (60° × 20 min; PH=6) 

Color dosing (60°C×20 min.) 

Run time = 10 min. (60°C) 

Color migration (80°C × 20 min.) 

Cooling (60°C) 

Level Check 

Soda dosing (60°C×30 min.) 

Dyeing run (Dark-60°C×60 min;Medium-60°C×40 min;Light-60°C× 
30 min) 

Dyeing sample check 

(If Ok) 

Drain 

After-treatment

Rinse (with cold Water) 

Neutralization after dyeing (50°C×20 min.) 

Drain 

Soaping (Hot wash) 

Drain 

Rinse 

Add finishing chemical(60°C×20 min) 

Drain 





Quality: 
Quality is a relative term. It means customer needs is to be satisfied. Quality is of prime importance in any aspect of business specially of export oriented products. Customers demand and expect value for money. As producers of apparel there must be a constant endeavor to produce work of good quality. Process flow chart of quality section of garment is given below.

Quality section in garment industry
Quality section in garment industry
Working Sequence of Quality Section:


Sample comments follow-up measurement 
↓ 
Pattern grading 
↓ 
Pattern through to cutting section 
↓ 
Fabric inspection (GSM, color shade etc) 
↓ 
Fabric Ok 
↓ 
Lay check 
↓ 
Print check 
↓ 
Line check 
↓ 
Sewing output check 
↓ 
After remove if have 
↓ 
Finishing (ironing) 
↓ 
Main check ( size measurement) 
↓ 
Size wise measurement 
↓ 
Get up checking 
↓ 
4 point measurement 
↓ 
Packing 
↓ 
Hand tag follows up


Garments Quality Control: 
Quality is a relative term. It means customer needs is to be satisfied. Quality is of prime importance in any aspect of business. In the competitive world no alternative of quality. Worlds trend is now quality not quantity. In the apparel business severely maintain quality of products. In this case, buyers satisfaction is the primary and basic goal. For maintaining quality of garments, quality is strictly control in garments industry. In this article, I will give a flowchart of garments quality control.
Quality Control System in Garments Industry
 
Flow Chart of Quality Control System in Garments Industry:

Check the batch information compare with the fabrics information’s. 
↓ 
Match the shade with the bulk production fabrics. 
↓ 
Check the running shade among the roll or roll to roll.( as per guide line). 
↓ 
Check the GSM, DIA and hand feel.(as guide line). 
 
Check the shrinkage (as guide line). 
↓ 
Check the any marks like sinker, needle, DIA, crease mark etc. 
↓ 
Check other faults. 
↓ 
Make report, Discussed with the respective persons to take actions. 
↓ 
Make grading as guide line. 
↓ 
Delivery the okay goods to the Stores. 
↓ 
Reject goods send to MIS store. 
↓ 
Follow up.

Knitting:
There are three types of fabric manufacturing process. They are weaving, knitting and non-weaving. Knitted fabric produced by loop forming. Such type of fabric huge demand in present world. For manufacturing of knitted fabric, process flow chart of knitting technology are given below.
Circular Knitting
Process Flow Chart for Knitting

Yarn in package form 
↓ 
Place the yarn package in the creel 
↓ 
Feeding the yarn 
↓ 
Set the m/c as per design & GSM 
↓ 
Knitting 
↓ 
Withdraw the roll fabric and weighting 
↓ 
Roll marking 
↓ 
Inspection 
↓ 
Numbering

Dispatching

Unload Garment is a basic need of human being. It's manufacturing process is complicated. Garment/Apparel manufacturing processing depends on some steps and techniques. It starts from order receiving and will be end to dispatching shipment of the finished garments. A process flow chart helps to understand how raw materials are moved from one process to another process until raw materials are transformed into the desired product (garments).
Garments manufacturing
Process Flow Chart of Garment Manufacturing 

Design/sketch 
↓ 
Basic block 
↓ 
Working pattern 
↓ 
Sample making 
↓ 
Basic manufacturing difference 
↓ 
Approved sample 
↓ 
Costing 
↓ 
Production pattern 
↓ 
Grading 
↓ 
Marker making 
 ↓  
Fabric spreading 
↓ 
Cutting 
↓ 
Sorting or bundling 
↓ 
Sewing 
↓ 
Ironing and finishing 
 ↓  
Final inspection 
↓ 
Packing 
 ↓  
Cartooning 
 ↓  
Send to buyer


In details apparel manufacturing sequence are given below:

Operation
Job
Method

01. Design/sketch
It is given by buyers to manufacturers containing sketches including measurements of the style
Manual/computerized   

02. Basic block
Without any allowance
Manual/computerized

03. Working pattern
Assimilating of diagram of net dimension on paper each and individual part which is called pattern and when we move with it throughout the  whole manufacturing processes. We term it working pattern.
Manual/computerized

Manual/computerized
04. Sample making
After getting all the speech the sample is made and sent to the buyers for approval to rectify the faults.
Manual

05. Basic manufacturing difference
The critical path is identified i.e the problem during the several operations.
Manual

06. Approved sample
After rectify the faults, sample is again sent to buyers. If it is ok, than it is called approved sample.
Manual

O7. Costing
  • Fabric required
  • Making charge
  • Trimmings
  • Profits
Manual

08. Production pattern
Add allowance with net dimension.
Manual/computerized

09. Grading
It is done according to different size.
Manual/computerized

10. Marker making
Maker is a thin paper which contains all the components of all sizes of a particular style.
Manual/computerized

11. Fabric spreading
Fabric is spreaded in lay form.
Manual/computerized

12. Cutting
To cut fabric according to the dimension by special types of cutter.
Manual/computerized

13. Sorting or bundling
Sorting out the component according to size and for each size make individual bundle.
Manual

14. Sewing
Sewing is done by different types of machines by the operation. Quality inspection is also done in that time
Manual

15. Ironing and finishing
Garments are treated by  steam. Also several finishing processes are done for example extra loose thread cutting.
Manual

16. Final inspection
Should meet specs given by buyer.
Manual

17. Packing
Poly packing.
Manual

18. Cartooning
After packing the garments are placed in a hard paper box .for export so as to minimize damage. The cartoons contain all the information over the box according to buyer specs.
Manual

19. Send to buyer
If everything is ok, it is sent to the buyer.
Manual


IMTA

Apakah IMTA Diwajibkan Jika TKA Tidak Bekerja di Indonesia?
Yth. Bapak/Ibu, kami adala sebuah PMA di Jakarta, yang mana secara sehari-hari tidak ada TKA-nya, tetapi ada 2 orang TKA - Direksi - di Akta Pendirian (Singapore dan UK). Tetapi beliau-beliau ini hanya di dalam akta saja tidak terlibat dalam operasional kantor di Jakarta, dan tidak menerima gaji dari Jakarta, beliau berkedudukan di kantor pusat Singapore. Apakah ada kewajiban bahwa direksi ini harus memiliki IMTA? Terima kasih ya.
Jawaban :
Kami asumsikan bahwa PT PMA (penanaman modal asing) tersebut adalah badan hukum perseroan terbatas (“PT”) yang didirikan di Indonesia, berdasarkan hukum Indonesia, dan oleh karena itu, tunduk pada ketentuan hukum Indonesia terutama UU No. 40 Tahun 2007 tentang Perseroan Terbatas (“UUPT”).
 
Berdasarkan Pasal 8 jo. Pasal 15 ayat (1) UUPT, anggaran dasar PT memuat nama jabatan Direksi serta keterangan nama lengkap, tempat dan tanggal lahir, pekerjaan, tempat tinggal, dan kewarganegaraan Direksi. Apabila Direksi warga negara asing (“WNA”) tercantum namanya dalam akta pendirian PT serta anggaran dasar, maka secara formal hukum ia menjabat sebagai Direksi, meskipun ia tidak pernah hadir dan tidak menerima gaji. Kami asumsikan jabatan yang dipegang oleh WNA tersebut bukan merupakan jabatan yang dilarang untuk dipegang oleh orang asing (simak penjelasan soal ini di dalam artikel Jabatan-Jabatan yang Dapat Dipegang Oleh Orang Asing).
 
Menurut hemat kami, PT PMA yang bersangkutan tetap wajib mengurus Izin Mempekerjakan Tenaga Kerja Asing (“IMTA”) untuk kedua WNA yang tercatat sebagai Direksi di dalam Akta Pendirian PT PMA tersebut. Hal ini sebagaimana diatur di dalam Pasal 42 ayat (1) UU No. 13 Tahun 2003 tentang Ketenagakerjaan, yang menyatakan bahwa setiap pemberi kerja yang memperkerjakan tenaga kerja asing ("TKA") wajib memiliki izin tertulis dari Menteri atau pejabat yang ditunjuk. Pengaturan lebih terperinci mengenai tata cara penggunaan TKA diatur di dalam Permenakertrans No. PER.02/MEN/III/2008 Tahun 2008 tentang Tata Cara Penggunaan Tenaga Kerja Asing (“Permenakertrans 02/2008”). 
 
Untuk bisa mendapatkan IMTA, perusahaan harus terlebih dahulu membuat Rencana Penggunaan Tenaga Kerja Asing (“RPTKA”) sebagaimana diatur Pasal 3 Permenakertrans 02/2008. Tata cara pengesahan RPTKA selanjutnya diatur dalam Pasal 5 ayat (1) dan (2) Permenakertrans 01/2008:
 
(1) Untuk mendapatkan pengesahan RPTKA sebagaimana dimaksud dalam Pasal 3 ayat (1), pemberi kerja TKA harus mengajukan permohonan secara tertulis yang dilengkapi alasan penggunaan TKA dengan melampirkan:
a.    formulir RPTKA yang sudah dilengkapi;
b.    surat ijin usaha dari instansi yang berwenang;
c.    akte pendirian sebagai badan hukum yang sudah disahkan oleh pejabat yang berwenang;
d.    keterangan domisili perusahaan dari pemerintah daerah setempat;
e.    bagan struktur organisasi perusahaan;
f.     surat penunjukan TKI sebagai pendamping TKA yang dipekerjakan;
g.    copy bukti wajib lapor ketenagakerjaan yang masih berlaku berdasarkan Undang-Undang Nomor 7 Tahun 1981 tentang Wajib Lapor Ketenagakerjaan di perusahaan; dan
h.    rekomendasi jabatan yang akan diduduki oleh TKA dari instansi tertentu apabila diperlukan.
 
(2) Formulir RPTKA sebagaimana dimaksud pada ayat (1) huruf a memuat:
a.    identitas pemberi kerja TKA;
b.    jabatan dan/atau kedudukan TKA dalam struktur bagan organisasi perusahaan yang bersangkutan;
c.    besarnya upah TKA yang akan dibayarkan;
d.    jumlah TKA;
e.    uraian jabatan dan persyaratan jabatan TKA;
f.     lokasi kerja;
g.    jangka waktu penggunaan TKA;
h.    penunjukan tenaga kerja warga negara Indonesia sebagai pendamping TKA yang dipekerjakan; dan
i.      rencana program pendidikan dan pelatihan tenaga kerja Indonesia.
 
Permohonan RPTKA disampaikan kepada Direktur Jenderal Pembinaan Penempatan Tenaga Kerja melalui Direktur Pengendalian Penggunaan Tenaga Kerja Asing (Pasal 8 Permenakertrans 02/2008). Kemudian, di dalam Pasal 42 Permenakertrans 02/2008 dinyatakan bahwa pengawasan terhadap perusahaan yang mempekerjakan tenaga kerja asing dilakukan oleh pegawai pengawas ketenagakerjaan sesuai peraturan perundang-undangan.
 
Jadi, dari uraian di atas dapat disimpulkan bahwa walaupun kedua Direksi WNA itu hanya tercatat namanya tapi (secara fisik) tidak bekerja di Indonesia atau menerima gaji dari perusahaan, perusahaan yang mempekerjakan TKA tersebut tetap harus mengurus IMTA untuk mereka. Hal ini karena secara formil keduanya, seperti Anda sebutkan, tercatat sebagai Direksi di dalam Akta Pendirian PT PMA yang bersangkutan.
 
Demikian jawaban dari kami, semoga bermanfaat.
 
Dasar hukum:
4.    Peraturan Menteri Tenaga Kerja dan Transmigrasi Nomor PER.02/MEN/III/2008 Tahun 2008 tentang Tata Cara Penggunaan Tenaga Kerja Asing

Restricted Substances List (RSL) Services


Restricted Substances List (RSL) Services

businesses identification and testing services for restricted substances within their own specific products to comply with various regional regulatory requirements.
Many businesses and associations create Restricted Substances Lists (RSL) and Declarable Substances Lists to provide an inventory of maximum recommended levels of known hazardous substances for a variety of products and packaging in numerous industries. Examples include the RSL for the American Apparel and Footwear Association (AAFA), the Joint Industry Guide (JIG) for the Electrical and Electronics Industry, and the Global Automotive Declarable Substances List (GADSL).  Also commonly known as a Green Procurement Standards, they provide guidelines suppliers must follow in order to help companies better prepare for continually evolving health and environmental standards by establishing and maintaining rules and documentation on the substances contained in their products.

Benefits of Creating a Restricted Substances List (RSL):
Restricted Substances List (RSL) Services Intertek can help businesses develop and enhance their own business-specific RSL or comply with their customer’s RSL requirements. Based on Intertek’s broad industry experience, knowledge of current and expanding global legislation, and supply chain solutions, a comprehensive Restricted Substance List can be created to meet your ongoing and future business requirements.


http://www.bockundpartner.com/home/management-systems/restricted-substances-list